Rebuilt Vacuum Furnaces

Graphite Furnace Systems Has a Complete Rebuilding Facility.

We will develop a project scope which includes as little as a controls upgrade to complete system rebuild with a new chamber, hot zone, controls, plumbing, wiring and rebuilt pumps.  We perform a rebuilding project with the same philosophy as a new custom furnace project keeping quality and customer satisfaction as our utmost goal.

Ipsen VFC 722

Resistance Vacuum Furnace

Scope of the Rebuild:

  • Used existing heater transformers
  • Used existing power feed throughs
  • Rebuilt existing pumps
  • New carbon steel vessel
  • Relined hot zone
  • New elements
  • New gas plumbing
  • New water plumbing
  • New controls and wiring
  • New water cooled cooling fan
  • Final cost was appx 50% of the cost of a new furnace

BEFORE

AFTER

Custom designed furnaces …

…to match your process requirements