Rebuilt Vacuum Furnaces
Graphite Furnace Systems Has a Complete Rebuilding Facility.
We will develop a project scope which includes as little as a controls upgrade to complete system rebuild with a new chamber, hot zone, controls, plumbing, wiring and rebuilt pumps. We perform a rebuilding project with the same philosophy as a new custom furnace project keeping quality and customer satisfaction as our utmost goal.
Ipsen VFC 722
Resistance Vacuum Furnace
Scope of the Rebuild:
- Used existing heater transformers
- Used existing power feed throughs
- Rebuilt existing pumps
- New carbon steel vessel
- Relined hot zone
- New elements
- New gas plumbing
- New water plumbing
- New controls and wiring
- New water cooled cooling fan
- Final cost was appx 50% of the cost of a new furnace
BEFORE
AFTER